Blog

Notes from the measurement side.

What we pick up putting instruments on sites, arguing over methods, and watching a market gradually learn to ask harder questions.

Showing all 6

A tractor working a field From the field

What 340 smallholder farmers taught us about building MRV

Our first Kelantan install assumed mains power that stayed on and a technician within reach. Neither was true. Four months of redesign later, the system was better on every other site as well.

A candlestick price chart on a dark screen Market

The price floor nobody wants to name

Durable removal under $90 a tonne nearly always means somebody is swallowing a cost they never priced. Usually the developer. Sometimes the community hosting the site.

A European parliament building Policy

Reading the EU CRCF as a build spec

Most commentary treats the Carbon Removal Certification Framework as paperwork. Read it as a technical spec and it tells you precisely what to go and build.

A handful of dark soil Methodology

Enhanced weathering has a sampling problem

Soil cores are the standard for verifying rock weathering. They are also sparse enough on the ground that two honest verifiers can come back 20% apart on the same field.

A pipette and rack of test tubes Market

What buyers really ask during diligence

We logged every question across 45 buyer diligence processes. There is a clear pattern, and it isn't the one most developers rehearse for.

Forest restoration site From the field

Three years of LiDAR over the same 2,800 hectares

Quarterly drone passes over one Sabah restoration site, from bare concession to closing canopy. The growth curve is not the shape the model drew.

No posts in this category yet. Try another filter.

Go deeper

Methods, reports and site write-ups

Everything we put out, including the raw method documents sitting behind every credit we issue.